Sunday, 31 May 2009
There are still some assignments that need to be done.
26.05.2009, Tuesday
Sailing training got me all wet. We were made to do our physical training on the wet floor since the sheltered areas were unavailable. At the end of the day, I went home in soaking wet clothes.
27.05.2009, Wednesday
Only two hours of lesson. I met up with Daryl for lunch and we ate the fish porridge near my house.
28.05.2009, Thursday
Sailing training for the competitive team is much tougher as compared to the normal training session. Two more days to the Adidas Sundown Marathon 2009 and five more days to the 21st Singapore Laser Trophy. I am going to be very physically drained from the two events.
29.05.2009, Friday
My bowling improved especially in the sparing. More practice is still needed though. On another note, Bioprocess Engineering Principles practical reports are all done. Still, there are some other assignments to do and I plan to complete it all by next week.
30.05.2009, Saturday
Chester and I went to the John Little Mega Sale this morning to shop. The merchandises there were sold at really reasonable prices. I got myself a New Urban Male t-shirt and a pair of shorts. For lunch, I met up with my mother and sister to eat at Seafood Harvest. The baked rice was delicious.
Adidas Sundown Marathon 2009 in the evening. 10km run in the night was sensational although my legs almost gave way in the final part. Thank God that my team did well and that the weather was so refreshing.
31.05.2009, Sunday
Global Day Of Prayer 2009 was amazing. Seeing so many believers coming together to pray simply amazes me. I went for the night session and there were about 10000 people present. The prayer was divided into many parts so that we can focus better on what to pray for.